Toro 4014-D Fitness Equipment User Manual


 
Groundsmaster 4000--D/4010--DPage 5 -- 24Electrical System
PTO Switch
The PTO switch is located on the console arm (Fig. 23).
The PTO switch is pulled up to engage the PTO and
pushed in to disengage the PTO.
The TEC--5001 controller monitors the position of the
PTO switch (up or down). Using inputs from the PTO
switch and other switches in the interlock system, the
TEC--5001 controller controls the energizing of the hy-
draulic solenoid valves used to drive the cutting deck
motors.
NOTE: To engage the PTO, the seat has to be occu-
pied, traction speed has to be in Low range (4WD) and
the cutting decks have to be fully lowered.
Testing
1. Before disconnecting the PTO switch for testing, the
switch and its circuit wiring should be tested as a TEC
input with the Diagnostic Display (see Diagnostic Dis-
playintheTroubleshootingsection of this chapter). If the
Diagnostic Display verifies that the PTO switch and cir-
cuit wiring are functioning correctly, no further switch
testingisnecessary. If, however,the Display determines
that the PTO switch and circuit wiring are not function-
ing correctly, proceed with test.
2. Make sure ignition switch is OFF. Remove key from
ignition switch.
3. Disassemble console arm to gain access to PTO
switch (see Console Arm Disassembly in the Service
and Repairs section of Chapter 7 -- Chassis).
4. Disconnect harness electrical connector from the
PTO switch.
5. The switch terminals are marked as shown in Figure
24. The circuit logic of the PTO switch is shown in the
chart below. With the useof amultimeter (ohmssetting),
the switch functions can be tested to determine whether
continuity exists between the various terminals for each
switch position. Verify continuity between switch termi-
nals. Replace PTO switch if testing identifies that switch
is faulty.
SWITCH
POSITION
CLOSED
CIRCUITS
OPEN
CIRCUITS
OFF (DOWN) COM B + NC B
COM C + NC C
COM B + NO B
COM C + NO C
ON (UP) COM B + NO B
COM C + NO C
COM B + NC B
COM C + NC C
6. If PTO switch tests correctly and circuit problem still
exists, check wire harness (see Electrical Schematics
and Wire Harness Drawings in Chapter 10 -- Foldout
Drawings).
7. After testing is completed, connect the wire harness
connector to the PTO switch.
8. Assemble console arm (see Console Arm Assembly
in the Service and Repairs section of Chapter 7 -- Chas-
sis).
1. PTO switch 2. Control console
Figure 23
1
2
1. COM B terminal
2. NO B terminal
3. NC B terminal
4. COM C terminal
5. NO C terminal
6. NC C terminal
Figure 24
2
3
1
6
4
5
NOTE: Only PTO switch terminals COM C and NO C
are used on Groundsmaster 4000--D and 4010--D ma-
chines.