ParaBody 425103 Home Gym User Manual


 
112 X 3-I/2"
~
’2~LOW I-~IGHT NUT
FIGURE 28
STEP 28
Assemble one 2/4" SLEEVE BEARING (77), one PEC CAM (24), two 3/4" FLANGE BEARINGS (76), one 1/2" WASI-IER (93),
one 1/2" LOW HEIGHT LOCK NUT (95), and a LEFT (19) or RIGHT PEC ARM (20) to each threaded shaft on the BEARING
HOUSING (6). See FIGURE 28.
¯
Securely assemble two 3/8" SPRING PIN ASSEMBLIES (51) to the spring pinbarrels of the PEC ARMS (19 & 20). See FIGURE
28.
¯
SECURELY assemble one TOMALOCK HANDLE (14) to each PEC ARM (19 & 20) using one 1/2 X 3-1/2" BOLT (90) and
t/2" LOW HEIGHT LOCK NUT (95) for each PEC ARM. See FIGURE 28.
24