Groundsmaster 4000--D Page 7 -- 5 Chassis
Removal (Fig. 2)
1. Park machine on a level surface, lower cutting
decks, stop engine, apply parking brake and remove
key from the ignition switch.
2. Remove front cutting deck (see Front Cutting Deck
Removal in Chapter 8 -- Cutting Decks).
CAUTION
When changing attachments, tires or perform-
ing other service, use correct jacks and sup-
ports. Make sure machine is parked on a solid,
level surface such as a concrete floor. Prior to
raising machine, remove any attachments t hat
may interfere with the safe and proper raising of
themachine.Always chock orblockwheels. Use
jack stands to support the raised machine. If the
machine is not properly supported by jack
stands, the machine may move or fall, which
may result in personal injury.
3. Chock rear wheels and jack up front of machine.
Support machine on jack stands.
4. Remove front wheel next to lift arm that is to be re-
moved.
5. Remove cap screw, washers and lock nut that se-
cure lift cylinder pinto lift arm. Remove pin and separate
lift cylinder and lift arm.
6. Remove lock nut that secures lift arm pin. Support lift
arm and slide pin from frame and lift arm. Remove lift
armfromframe.
7. Remove height--of--cut chain, ball joint mount and
ball joint from removed lift arm as required.
Installation (Fig. 2)
1. Position lift arm to frame and insert lift arm pin. En-
gage roll pin into frame slots and install lock nut on pin.
Torque lock nut from 60 to 70 ft--lb (81 to 94 N--m).
2. Align lift cylinder with lift arm. Slide pin through lift
arm and cylinder end. Secure pin with cap screw, wash-
ers and lock nut.
3. Install front wheel assembly.
4. Lower machine to the ground.
5. If height--of--cut chain u--bolt was removed from lift
arm, assemble u--bolt so that threaded portion extends
0.870” (22.1 mm) above mounting plate on lift arm (Fig.
3).
6. If removed, install ball joint to lift arm. Distance from
end of lift arm to center of ball joint should be from 2.210”
to 2.390” (56.1 to 60.7 mm) (Fig. 4). Make sure that ball
joint is horizontal and that stud is centered in ball joint.
Install deck before torquing ball joint jam nut (item 24).
7. Installball jointmountto balljointwith slotted hexnut.
Torque nut from 90 to 100 ft--lb (123 to 135 N-- m) while
aligning cotter pin holes. Install cotter pin.
8. Install front cutting deck (see Front Cutting Deck
Installation in Chapter 8 -- Cutting Decks).
9. Ifballjointwas removed from lift arm, torque ball joint
jam nut from 150 to 175 ft-- lb (203 to 237 N--m).
10.Lubricate lift arm grease fittings.
11.Afterassembly is completed, raise andlowerthecut-
ting deck toverifythathydraulic hoses and fittings donot
contact anything.
12.Check height--of--cut and deck pitch adjustment.
1. U--bolt 2. Height--of--cut chain
Figure 3
0.870”
(22.1 mm)
1
2
1. Lift arm 2. Ball joint
Figure 4
2.210” to 2.390”
(56.1 to 60.7 mm)
1
2
Chassis