Precor EFX534i Treadmill User Manual


 
532i Elliptical Fitness CrossTrainer Assembly Guide 10
Remove the handrail covers and the two Phillips-head screws.
Set them aside.
One end of the handrail has a hole drilled into it. Position the
handrail so the hole aligns with the mounting hole on the
console bracket tube.
Feed the heart rate cables through the handrail clamp as
shown.
Slide each handrail into the console bracket tube at the same
time you insert it into the handrail clamp behind the display.
Insert two flat head screws (J) to secure the handrails to the
handrail stub. Wrench tighten using a Phillips-head
screwdriver.
Retighten the two handrail clamp screws using the ³⁄₁₆-inch
hex key.
Connect the heart rate cables to the heart rate display cables
as shown.
Reinstall the handrail covers.
1. Position the two lower handrail covers around the console
bracket tube. Loosely secure them together using the two
Phillips-head screws removed in step 26.
2. If necessary, rotate the covers so the screw heads are
facing the rear of the EFX. Slide the covers against the
handrails and align the top cover. Apply pressure to bring
the top and bottom covers together. An audible click is
heard when the covers are properly secured.
3. Wrench tighten the screws.