ParaBody 425104 Home Gym User Manual


 
@
U.
FIGURE 30
STEP 30
¯ Assemble one 314" SLEEVE BEARING (77), one PEC CAM (24), two 3/4" FLANGE BEARINGS (76), one 1/2" WASHER (93),
1/2" LOW HEIGHT LOCK NUT (95), and a LEFT (19) or RIGHT PEC ARM (20) to each threaded shaft on the BE ARING HOUSING
(6). See FIGURE 30.
¯ Securely ~semble two 3/8" SPRING PIN ASSE~v~LIES (5 t) to the spring pin b:wrels of the PEC ALUMS (19 & 20). See FIGURE
¯
SECURELY assemble one TOMA_LOCK HANDLE (14) to each PEC AP~.I (19 & 20) using one 112 x 3-112" BOLT (90) and one 1t2"
HEIGHT LOCK NUT (95) for each PEC ARlVl. See FIGURE 30.
26