Chapter 6. Tool support for MDSD 135
Open the WB Sequence Diagram.
Add the participants to the sequence diagram:
– Expand 00 Enterprise Level → Actors → LocalForecaster, and drag
and drop the LocalForecaster system actor into this sequence diagram
(Figure 6-54).
Figure 6-54 Drag actor into the sequence diagram
– Expand 01 System Level → Logical Elements:
• Drag and drop the WeatherTrackingUI system into the sequence
diagram.
• Drag and drop the WeatherTrackingController system into the
sequence diagram.
• Drag and drop the DopplerController system into the sequence
diagram.
• Drag and drop the GroundStation system into the sequence diagram
• Drag and drop the WeatherTrackingProcessor system into the
sequence diagram.
– Save the work (Ctrl+s).