10
8. Attach the Squat Arm (16) to the Squat Frame (9)
with four M10 x 35mm Bolts (69), four M10
W
ashers (77), and four M10 Nylon Locknuts (80).
Make sure the bolt heads rest inside of the
hexagonal holes in the Squat Frame.
Wet the Squat Arm (16) with soapy water. Slide
two Short Foam Pads (10) and two Handgrips
(29) onto the Squat Arm.
10.
Press two 50mm Square Inner Caps (30) into the
T
op Frame (1
1).
Attach the Top Frame (11) to the Rear Upright (6)
with two M10 x 60mm Bolts (72), two M10
Washers (77), and two M10 Nylon Locknuts (80).
Make sure the bolt heads rest inside of the
hexagonal holes in the Rear Upright. Do not
tighten the Locknuts yet.
Attach the Top Frame (11) to the Front Upright (5)
with two M10 x 67mm Bolts (65), two M10
Washers (77), and two M10 Nylon Locknuts (80).
Do not tighten the Locknuts yet.
9. Slide the Squat Frame (9) onto the Rear Upright
(6) so that the 90mm Pulley (46) is towards the
Front Upright (5).
16
80
80
69
10
29
10
9
77
77
46
6
5
9
11
77
65
30
30
80
80
72
72
77
80
6
5
69
8
9
10