ParaBody GS6 Home Gym User Manual


 
STEP 29:
FIGURE 29
• Assemble one 3-1/2” PULLEY (49) to the bracket on the BASE (A) using one 3/8 X 2-1/4” BOLT (52),one 3-1/2” PULLEY GUARD
(C), one 3/8” SPACER (31) and one 3/8” LOCK NUT (28). See FIGURE 29(a) (Note: Loop the LOW CABLE (45) around the
PULLEY prior to assembling the PULLEY to the BASE .)
• Assemble one 3-1/2” PULLEY (49) and one 3-1/2” PULLEY GUARD (C) to the BASE (B) using one 3/8 X 2-1/4” BOLT (52), one 3/8
X 7/16” SPACER (33) and one 3/8” LOCK NUT (28). See FIGURE 29. (Note: Loop the LOW CABLE (AW) around the PULLEY prior
to assembling the PULLEY to the BASE.)
• Route the LOW CABLE (AW) under one 4-1/2” V-GROOVE PULLEY (51) and assemble the 4-1/2” V-GROOVE PULLEY (50) to the vertical
bracket on the FOOT FRAME (F) using 3/8 X 2-3/4” BOLT (15) and one 3/8” LOCK NUT (28). See FIGURE 29(c)
• Route the LOW CABLE (AW) around one 3-1/2” PULLEY (49) and assemble to the horizontal bracket on the FOOT FRAME (F) using
one 3/8 X 1-3/4” BOLT (17), one 3-1/2” PULLEY GUARD (C) and one 3/8” LOCK NUT (28). See FIGURE 29(c)
• Assemble one 3-1/2” PULLEY (49) to the tube on the BASE (A) using one 3/8 X 3” BOLT (14), one 3/8 WASHER (23) one 3-1/2”
PULLEY GUARD (C), one 13/32“ SPACER (33) and one 3/8” LOCK NUT (28). See FIGURE 29(b) (Note: Loop the LOW CABLE
(AW) around the PULLEY prior to assembling the PULLEY to the BASE .)
• Assemble one 3-1/2” PULLEY (49) to the PRESS LOAD ARM (AE) using one 3/8 X 3-1/2” BOLT (12), one 3/8 WASHER (23)
one 3-1/2” PULLEY GUARD (C) and one 3/8” LOCK NUT (28). See FIGURE 29(b) (Note: Loop the LOW CABLE (AW) around the
PULLEY prior to assembling the PULLEY to the PRESS LOAD ARM .)
C
17 3/8 X 1-3/4”
15 3/8 X 2-3/4”
52 3/8 X 2-1/4”
3/8 X 3-1/2” 12
52 3/8 X 2-1/4”
3/8 X 3” 14
49
28
C
49
32
28
33
49
AE
A
23
31
49
C
28
51
F
27
(a)
(b)
(c)
28
C