ParaBody GS6 Home Gym User Manual


 
20
FIGURE 20
STEP 21:
FIGURE 21
STEP 20:
• Insert one 3/4” X 6” SHAFT (36) into the tube on the REAR FRAME (D) as shown.
26
D
1/2 X 7-1/4” 2
D
I
26
1/2 X 10-1/2” 1
SECURELY assemble the PRESS ARM (I) to the REAR UPRIGHT (D) using one 1/2 X 10-1/2” BOLT (1), two 1/2” WASHERS (22)
and one 1/2” LOCK NUT (26) as shown in FIGURE 21.
AE
SECURELY assemble the PRESS LOAD ARM (AE) to the REAR FRAME (D) using one 1/2 X 7-1/4” BOLT (2), one 1/2” WASHER
(22) and one 1/2” LOCK NUT (26). (Note: Tighten this connection enough to remove excess play yet allow the PRESS LOAD
ARM to rotate freely.)
22
36
22