A SERVICE OF

logo

ENGINE REMOVAL/INSTALLATION 8-13
Engine Removal/Installation
Install the left and right upper inner fairing brackets.
Run the leads, cable and hoses c orrectly (see Cable, Wire
and Hose Routing section in Appendix chapter).
Install the removed parts (see appropriate chapters).
Adjust:
Throttle Cables (see Throttle Control System Inspection
in the Periodic Maintenance chapter)
Clutch Cable (see Clutch Operation Inspection in the Pe-
riodic Maintenance chapter)
Drive Chain (see Drive Chain Slack Inspection in the
Periodic Maintenance chapter)
Fill the engine with engine oil (see Engine Oil Change in
the Periodic Maintenance chapter).
Fill the engine with coolant and bleed the air from the cool-
ing system (see Coolant Change in the Periodic M ainte-
nance c hapter).
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com
www.zxforums.com