Bushnell 950 Elliptical Trainer User Manual


 
6
STEP 1 – Main Frame Assembly
a) Remove (4) Allen Bolts, (4) Washers,
(2) Nylon Nuts and (2) Nut Caps from
Main Frame, see Figure 1.
b) Position Left and Right Roller Tubes
behind Main Frame with Roller Tracks
on top and rear Allen Bolts facing
each other.
c) Slide Left and Right Roller Tubes into
Main Frame, align bolt holes and
secure with (4) Allen Bolts, (4) Washers
and (2) Nylon Nuts removed in Step 1a.
Tighten bolts with Allen Wrench provided
and install (2) Nut Caps.
d) Remove (2) Allen Bolts and (2) Washers
from rear of Left and Right Roller Tubes.
e) Position Stabilizer Bar between Right and
Left Roller Tubes, align bolt holes and
re-install (2) Allen Bolts and (2) Washers
that were removed in Step 1d. Tighten
bolts with Allen Wrench provided.
STEP 2 – Foot Platform Installation
a) Remove (2) Allen Bolts, (2) Washers
and (2) Nylon Nuts from the underside
of each Foot Platform, see Figure 2.
b) Rotate Crank to the down stroke
position and slide (1) Foot Platform
onto either Front Foot Tube, see
Figure 2.
c) Align bolt holes and secure using
(2) Allen Bolts, (2) Washers and
(2) Nylon Nuts removed in Step 2a.
d) Lower Foot Platform and position
Roller in Roller Track, see Figure 2.
e) Repeat Steps 2b - 2d to install the
remaining Foot Platform.
Figure 1 - Assemble Main Frame
Figure 2 - Install Foot Platforms
left front
foot tube
main
frame
M8 x 90mm
allen bolt
left roller tube
right roller
tube
M8 x 15mm
allen bolt
right front
foot tube
M8 washer
roller track
M8 x 20mm
allen bolt
stabilizer
bar
M8 washer
nut
cap
M8
nylon
nut
roller track
foot platform
foot platform
M8 x 80mm
allen bolt
left front
foot tube
main
frame
right front
foot tube
M8
nylon
nut
M8 washer
M8 x 80mm
allen bolt
M8
washer
roller
roller
crank