ParaBody GS4 Home Gym User Manual


 
3/8 X 3-3/4” 6
AM
19
A
35
26
15
STEP 14:
FIGURE 14
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2
• Route the LAT CABLE (AM) through the FRAME (A) and assemble one 3-1/2” PULLEY (35) to the FRAME (A) using one
3/8 X 3-3/4” BOLT (6), two 3/8 X 1-1/16” FLANGE SPACERS (26) and one 3/8” LOCK NUT (19). See FIGURE 14.
(NOTE: Make sure the cable runs in the grooves of the pulleys.)