ParaBody 220 Home Gym User Manual


 
3/8 X 1 -3/4"
3/8 X 3-3/4"
STEP 17:
¯
Refer to cable ILLUSTRATION "A" on lmge 11 for cable routing while installing pulleys.
¯ Assemble one 3-1/2" PULLEY (24) between BASE PLATES (3) using one 3/8 X 3-3/4" BOLT (30), two 3/8 X 1" SPACERS
(43), one 3/8" LOCK NUT (34) and tighten securely.
Loosely assemble one 3-1/2" PULLEY (24) between the PULLEY PLATES (12) using one 3/8 X i-3/4" BOLT (27), and
3/8" LOCK NUT (34).
Secure end of LOW CABLE (21) using one 3/8 x 3-3/4 BOLT (30), one 3/8" FLAT WASHER (36) one 3/8" LOCK NUT
as shown in FIGURE 17
Tighten both 3-1/2" PULLEYS (24)located on PULLEY PLATES (12)
1/2 ] 1/2
I
1/2
I
1/2
I
1/2
] 1/2 ]
1 2
3 4
5
6