FIGURE 13
¯ STEP 13:
¯
Refer to cable ILLUSTRATION "A" on page 11 for cable routing while installing pulleys.
Assemble two 3-1/2" PULLEYS (24) into FRAME (1) using two 3/8 X 3-3/4" BOLTS (30), four 3/8 X 1-1/16"
FLANGE SPACERS (42) and two 3/8" LOCK NUTS (34) and tighten securely.
Assemble one 3-1/2" PULLEY (24) into PRIMARY PIVOT (9) upper hole using one 3/8 X 8" BOLT (31),
two 3/8" FLAT WASHERS (36), two 3/8 X 1-3/16" SPACERS (44) and one 3/8" LOCK NUT (34) and tighten securely
[
1/2 [
1/2 [ 1/2 ] 1/2 [ 1/2
[ 1/2
0
1 2 3 4
5
6
15