FIGURE 14 \
/
STEP 14:
Refer to cable ILLUSTRATION "A" on page 11 for cable routing while installing pulleys.
Assemble one 3-1/2" PULLEY (24) into the PRIMARY PIVOT (9) lower hole using one 3/8 X 8" BOLT (31),
two 3/8" FLAT WASHERS (36), two 3/8 X 1-3/16" SPACERS (44) and oue 3/8" LOCK NUT (34) and t~:ghten securely.
Assemble one 3-1/2" PULLEY (24) to the FRAME (1) using one 3/8 X 3-3/4" BOLT (30), two 3/8 X 1-1./16"
FLANGE SPACERS (42), one 3/8" LOCK NUT (34) and tighten securely
Loosely assemble one 3-1/2" PULLEY (24) between PULLEY PLATES (12) using one 3/8 X 1-3/4" BOLT (27)
one 3/8" LOCK NUT (34).
¯
Assemble two 3-1/2" PULLEYS (24) between the left and right BOOM PLATES (4) and (5) using two 3/8 X 3-3/4" BOLTS
four 3/8 X 1" SPACERS (43) and two 3/8" LOCK NUTS (34)
[ 1/2 [ 1/2 [
1/2 [ 1/2
I
1/2 [ 1/2
[
0.
1
2 3
4 5
6
16