BOLT(D)
Qty:1
FLATWASHER(E)
27mm
Qty:1
WAVYWASHER(F)
29ram
Qty:1
MAINFRAME
CONSOLECABLES
ELEVATIONFRAMECONSOLECABLES
A. PuffLEADWIREthroughRIGHTCONSOLEMASTAfter
puffing theLEADWIREthroughthemast, the top of the
CONSOLECABLESshouldbelocatedat the top of the
mast.Detachand discardLEADWIRE.
B.OpenHARDWAREBAG2.
C.MoveRIGHTLINKAGEARMinto positionandattach to
ELEVATIONFRAME.
NOTE..WhileholdingRIGHTCONSOLEMASTin the
upright position,tightenPRE-ATTACHEDBOLTusing
T-wrenchto attach RIGHTLINKAGEARM.
D.AttachRIGHTCONSOLEMASTtoMAINFRAMEusing1
BOLT(D),1 FLATWASHER(E)and 1 WAVYWASHER(F).
E.Lift the RUNNINGDECKuntil locklatch onsideof
treadmifl is fully engaged.
F. RemoveCONSOLEfromboxandplace outof the way.
G.Lowerthe treaflmiflRUNNINGDECKfrom the folded
positionbysteppingonLOCKLATCHonlowerright side.
MAST
BOLT(B)
movethetreadmill from thebox
i and themachine has sprung
andCan,otbeaSsembled,
refer to the troubleshooting
section in order to restorethe
i treadmill to its properposition,