15
J
K
L
M
N
Q
R
O
P
AD1
AD1
Q03
Q03
7
STEP
Remove slotted bolt and nut from the end of
Cable #3. Cable #3 starts at the left
adjustment handle (AD1). Guide the cable
in between Pulleys J and K and down length
of upright, around Pulleys L, M, N. Weave
the cable up around the front of pulley O,
through the back of pulley P, and over the
back of pulley Q. Guide the cable through
the inside of the hole on the side of the left
top cap (Q03). Exit the hole and allow the
cap to be suspended by the cable. Finish
routing the cable over Pulley R and down to
the anchor. Reattach the bolt and nut to the
end of the cable and thread in a minimum
0.5”. Tighten nut against anchor.
CABLE #3