1.2. Checklists
Deployment time, link-up time and support time can be improved by adopting proper site survey analysis,
link planning, pre-installation tests, and web-GUI familiarization. The following pre-installation and post-
installation checklist attempts to give the installer the basic understanding on the points to consider for a
wireless deployment.
Pre-Installation Checklist for airClient TOTAL
Organization Name/Site Name
Address
City
State
Zip Code
Telephone Number
Site Survey and Link Planning
No Parameters Units Site A Site B
1 Regulatory Standard to be followed FCC/ETSI
2 Frequency Band sB3415: 2.4GHz only
3 Maximum Output Power as per the Regulatory
Authority (EIRP)
100mW/1W/4W
4 Latitude Deg Min Sec
5 Longitude Deg Min Sec
6 UPS Installed Yes/No
7 UPS specification if any KVA
8 Line Voltage 90V-264V AC,50-60 Hz
9 Near Line of Site between sites Yes/No
10 Height of tower Feet/Meters
11 Required Throughput Mbps
12 Distance between sites Miles/km
13 Antenna Type Internal/External
14 Antenna Manufacturer smartBridges/Other
15 Gain of antenna dBi
16 Antenna Polarization Horizontal/Vertical
Horizontal - deg
17 Beam width of antenna
Vertical - deg