New Balance 5K Bicycle User Manual


 
_ STEP 10 - Water Battle Holder
Installation
a) Remove (2) Phillips Screws from Computer
Tube
b) Align holes and affach Water Be/file Holder
to Computer Tube with phillips screws
removed In Step A
e) Place water bottle In holder
compute
tube
\
water bathe
looking #am the
left slde c#the unit
Figure 10 - Install Water Bottle Holder
receptacle
AC adapter
main
frame
_ STEP 1 1 - AC Adapter
a) Plug AC Adapter Into receptacle
located in the Main Frame near
the Front Foot Tube, see Figure 10.
b) Insert AC Adapter plug into outlet
in wall.
Figure 11 - AC Adaptor
Once your Recumbent Bike is assembled, make sure that your workout space has a solid, level surface with
plenl¥ of space around it,We recommend placing a ma_ under your unit to protect your flooring,
Correct Workout Position
When exercising, keep your back straight and your head ina neutral position to minimize neck and upper
back strain.When pedaling do not lock out your knees, at the bottom of the pedaling motion there should
be a slight bend in the knee• Always try to pedal the bike with a smooth and rhythmic motion,
11_