STEP 12 (See Diagram 12 & Cable Loop Diagram)
A.) Attach one end of the 276” Leg Press Cable (#44) to the open bracket underneath
the Left Seat Support (#15). Secure it with one M10 x 1” Allen Bolt (#81), two Ø ¾”
Washers (#94), and one M10 Aircraft Nut (#97).
B.) Attach a Pulley to the top opening on the Leg Press Frame (#16). Secure it with
one M10 x 2 3/8” Allen Bolt (#84), two Pulley Bushings (#78), and one M10 Aircraft
Nut (#97).
C.) Draw the Cable around the Pulley then back to the top opening on the Left Seat
Support. Repeat Procedure B above to install a Pulley.
D.) Draw the Cable around the Pulley back to the lower opening on the Leg Press
Frame (#16). Repeat Procedure B above to install a Pulley.
E.) Draw the Cable around the Pulley along the Left Base Frame (#14) through the
opening on the bottom of Left Vertical Beam (#17) to the first open bracket on the
Left Base Frame.
F.) Install a Pulley and secure it with one M10 x 1 ¾” Allen Bolt (#82), one 2 7/8” L-
shaped Cable Retainer (#33), two Ø ¾” Washers (#94), and one M10 Aircraft Nut
(#97).
G.) Draw the Cable underneath the Pulley then upward to the Angled Double Floating
Pulley Bracket (#27) previously installed in Step-8. Install a Pulley to the Bracket.
H.) Draw the Cable around the Pulley then downward to the second open bracket on
the Left Base Frame. Install a Pulley with an U-shaped Cable Retainer (#35).
I.) Draw the Cable upward to the Flat Double Floating Pulley Brackets (#36) previously
installed in Step-9. Install another Pulley.
J.) Draw the Cable around the Pulley then downward to the open bracket on the rear
of Left Base Frame. Install a Pulley with a 2 7/8” L-shaped Cable Retainer (#33).
K.) Draw the Cable underneath the Pulley across the corner to the open bracket on the
Right Base Frame (#1). Repeat Procedure J above to install a Pulley.
L.) Draw the Cable underneath the Pulley then upward to the Flat Double Floating
Pulley Bracket (#36) previously installed in Step-10. Install another Pulley.
M.) Draw the Cable around the Pulley then downward to the open bracket on the Right
Base Frame (#1). Secure the end of the Cable with one M10 x 1” Allen Bolt (#81),
two Ø ¾” Washers (#94), and one M10 Aircraft Nut (#97).
N.) Check the tension of the cable loop system. If the cables are too loose, shorten the
Short Chain previously installed in Step 11 G.
22