Impex EVE-1500 Home Gym User Manual


 
STEP 10 (See Diagram 10 & Cable Loop Diagram)
A.) Attach the 180” Upper Cable (#40) to the front opening on the Right Upper Frame (#4).
B.) Place a Pulley (#60) to the opening and secure it with one M10 x 2 3/8” Allen Bolt (#84),
two Pulley Bushings (#78), and one M10 Aircraft Nut (#97). Make sure the ball stopper
on the Cable is underneath the Right Upper Frame.
C.) Draw the Cable over the Pulley along the Right Upper Frame to the rear opening on the
Right Upper Frame. Repeat Procedure B above to Install a Pulley. Draw the Cable
around the Pulley then downward. Install a Pulley to two Flat Double Floating Pulley
Brackets (#36). Draw the Cable around the Pulley then upward to the open bracket
underneath the Right Upper Frame. Let the Brackets hanging for now.
D.) Install a Pulley to the bracket. Draw the Cable around the Pulley then downward. Install
a Pulley to two Flat Double Floating Pulley Brackets. Draw Cable around the Pulley
then to the opening on the Right Vertical Beam (#3). Let the Brackets hanging for now.
E.) Repeat Procedure B above to install a Pulley to the opening. Draw the Cable around
the Pulley then through the opening. Insert the end of Cable through a Ball Stopper
(#46) to a Cable Head Connector (#45). Drop the end into the slot on the connector.
20