16. Locatethe Crossbow Fulcrum(18) on the Lat
Tower (4) (see the insetdrawing). Slide the
Crossbow Spacer (35) ontothe rodson the
Crossbow Fulcrum. Make sure the Spacer is
oriented as shown in the drawing.
Set the Crossbows intothe CrossbowSpacer (35)
in the followingorder:the 1O-PoundRemovable
Crossbow(67), the 20-Pound Removable
Crossbow(36), an 80-Pound Crossbow(95), the
10-Pound Center Crossbow(44), an 8O-Pound
Crossbow(95), and the 40-Pound Crossbow(96).
Make sure the indicated rings are on the side
shown end the arrows point toward the Spacer.
Attachthe Crossbow Cover Plate (72), withthe
edges up,to the Crossbow Spacer (35) with two
M8 x 19mm Button Head Screws (86).
17. Locate the Long Cable (80). Insertone end of
the Cable throughthe weldedtube on the indicat-
ed end ofthe CrossTube (11) and thenthrougha
SwivelArm (22). If necessary,usethe tip ofa
screwdriverto pullthe end of the Cable out ofthe
Swivel Arm. Be sure the Cable Is on the indicat-
ed side of the welded rod In the Swivel Arm.
Insert the SwivelArm (22) intothe welded tube
on the Cross Tube (11). Secure the Swivel Arm
with an M4 x 5ram Screw (104).
Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley inside ofthe SwivelArm
(22) with an MIO x 42ram ButtonHead Bolt (71)
and an M1ONylon Locknut(76).
18. Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulley and a Pulley Guard (29) to
the indicatedM1Ox 140mm Carriage Bolt(73)
with an M10 Nylon Locknut(76). Be sure the fiat
edge of the Pulley Guard is on the side
shown.
19. Attach a PulleyHousing (94) to the indicated"U"-
channel on the 10-Pound Center Crossbow(44)
with an M10 x 102mm ButtonHead Bolt (24), two
Pivot Bushings(74), and an M10 Nylon Locknut
(76).
Wrap the Long Cable (80) around a 90mm Pulley
(28). Attach the Pulleyinside ofthe Pulley
Housing (94) with an M10 x 42mm ButtonHead
Bolt(71) and an M10 Nylon Locknut(76).
16 86
up
Rings on
96
Rods 67
95
17
0 71
10,
28--_q
76
18
Flat
Edge 2._,/76
19_. Channel
10