S~ep 2
Secure the press cable (105) and two .~-1/2" pulleys
(111) to the pulley flats on the press base (15) and
press weight stack base (1) using two 3/8 x 2" bolts
78). and ’two .~/8" nylock nu,s(83). (Note: The press
cable should be routed underneath the short leg of the ’L’
bracket. Also the ’L’ brackets should be positioned
straight down ,o function properly.)
B.
Secure ,he press cable (105) and one 3-1/2" pulley (111) to the press guide rod support
using one 3/8 x 2-3/4" bolt (99). two 3/8" flange spacers (74). and one 3/8" nyl(>ck nut
(Note: Loop ,he cable over_the pulley prior to inserting it
Screw ,he threaded end of the press cable (105) approxima,ely 3/4" into the end of the
selec,or shaft (113) and ,[ghten ]am nu, securely as shown.
If upon completion of assembly, the head plate (117) does
no, sit on top of ,he firs, weight plate (67). push the head
pla,e down. insed ,he selector pin (72) and perform several
repetitions at the station. This will relax the cable system
and preven, the head pla,ed from lifting up.
sit on ~op of the firs, weight plate or if there is excess
slack in the cable sys,em, adjust ,he threaded end of the
cable accordingly arid retighten the iam nut.
23