: F~IGURE 10
Make sure CABLE
is routed over bolt!
3/8 X 2-314"
STEP 10:
¯ Route one CABLE (18) through the TOP BOOIvl (1) as sho~m in FIGURE 10. (NOTE: Make sure CA_BLE is routed over bolt!)
¯
SECURELY assemble three 3-1/2" PULLEYS (16) into the slots of the TOP BOOM (1) using three 3/8 X 2-3/4" BOLTS (32), six
FLANGE SPACERS (39), and three 3/8" LOCK NUTS (42) as sho~a in FIGUqLE 10. (NOTE: Make sure tile cable is routed over all
pulleys.)