FIGURE 16
STEP 16:
¯ Slide tas’o 1X 8" GRIPS (20) onthe LOW ROW BAR (10) and two 1X8" GRIPS (20) onthe LATBAR (9~ as sho~in FIGLrRE
¯ Attach the LAT BAR (9) to the ball end of the upper CABLE (18) using one 5/16" SNAP HOOK (47) as shown in FIGURE
¯
Attach the LOW ROW BAR (10) to the ball end of the lower CABLE (18) using one 12-LINK ~ (49) and two 5/16"
HOOKS (47) as shown in FIGURE 16.
¯
If the PEC DEC ATTACHMENT will not be assemble at this time, eight 9/16" CAP PLUGS (29) have been supplied to plug exposed
holes on the UPRIGHT FRAME (2) as shown in FIGURE 16.
Thank you for purchasing the Parabody 893104 PRO SYSTEM. Ifunsure of proper u:~e of equipment, call
your local Parabody distributor or call the Parabody customer service department at (:~00) 328-9714.
13