9
13. Lubricate an M10 x 50mm Bolt (62) with grease.
Attach the Pivot Bracket (48) to the Right Butterfly
Arm (11) with the Bolt and an M10 Nylon Locknut
(70). Do not overtighten the Locknut; the Pivot
Bracket must be able to pivot easily
.
Press a 40mm x 50mm Inner Cap (23) into the
indicated end of the Right Butterfly Arm (11). Wet
the bottom end of the Arm with soapy water. Slide
a Large Foam Pad (19) onto the Arm.
Slide a Foam Grip (76) onto a Press Handle (12).
Press a 25mm Round Inner Cap (24) into the end
of the Handle. Attach the Handle to the Right
Butterfly Arm (11) with two M8 x 16mm Bolts (64)
and two M8 Washers (26).
Slide the Large Foam Pad (19) down so that the
bottom of the Foam Pad is even with the bottom
of the Right Butterfly Arm (11).
Repeat this step with the Left Butterfly Arm (10).
11. Press the two Weight Guide Bushings (44) into
the Center Top Frame (14). Slide the Center Top
Frame onto the W
eight Guides (20).
Attach the Center
Top Frame (14) to the Right
Top Frame (8) with two M10 x 70mm Bolts (81),
two M10 Washers (75), and two M10 Nylon
Locknuts (70).
Attach the Center Top Frame (14) to the Left Top
Frame (3) with two M10 x 70mm Bolts (81), two
M10 Washers (75), and two M10 Nylon Locknuts
(70).
Tighten all of the M10 Nylon Locknuts (70)
used in steps 3–11.
75
75
75
70
70
14
8
3
44
20
81
81
70
70
11
22
41
70
8
6
9
61
Lubricate
12
64
26
26
64
76
19
10
12
1
1
70
48
62
24
23
13
12. Press a 38mm Square Inner Cap (41) into the
Right Upright (6). Press a 50mm x 70mm Inner
Cap (22) into the Butterfly Frame (9).
Lubricate an M10 x 80mm Bolt (61) with grease.
Attach the Butterfly Frame (9) to the Right Top
Frame (8) with the Bolt and an M10 Nylon Locknut
(70). Do not overtighten the Locknut; the
Butterfly Frame must be able to pivot easily.
ARM ASSEMBLY
Lubricate