18
45. Wrap the Low Cable (47) around a 90mm Pulley
(38). Attach the Pulley and a Cable Trap (91) to
the indicated bracket on the Right Base (1) with
an M10 x 45mm Bolt (66) and an M10 Nylon
Locknut (70).
Be sure the Cable T
rap is turned
to hold the Cable in the groove of the Pulley.
47. Wrap the Low Cable (47) around a 90mm Pulley
(38). Attach the Pulley and a Cable Trap (91) to
the side of the Right Upright (6) with an M10 x
95mm Bolt (98), an M10 Washer (75), and an
M10 Nylon Locknut (70). Be sure the Cable Trap
is turned to hold the Cable in the groove of
the Pulley.
48.
Wrap the Low Cable (47) around a 90mm Pulley
(38).
Attach the Pulley and a pair of Pulley
Covers (92) to the Right Upright (6) with an M10
x 100mm Bolt (84), two M10 Washers (75), and
an M10 Nylon Locknut (70).
Be sure the small
tabs on the Pulley Covers are on the side
shown, and the Cable is between the Pulley
and the rod on the Upright.
46. Wrap the Low Cable (47) around a 90mm Pulley
(38). Attach the Pulley and a Cable Trap (91) to
the lower set of holes in the indicated “U”-Bracket
(85) with an M10 x 50mm Bolt (62) and an M10
Nylon Locknut (70). Be sure the Cable Trap is
turned to hold the Cable in the groove of the
Pulley.
66
1
38
91
45
62
70
91
85
38
47
46
98
70
91
75
6
38
47
47
70
75
Small
Tabs
92
92
6
84
38
47
48
70
75