Weider WESY29510 Home Gym User Manual


 
10
16
15
15. During steps 15 through 27, refer to the CABLE
DIAGRAM on page 21 to verify proper cable rout-
ing.
IMPORTANT: While assembling the cables, do
not overtighten the bolts and nuts securing
the pulleys. The pulleys must be able to turn
freely.
Locate the Long Cable (41). Route the Long
Cable around a 3 1/2” Pulley (45). Attach the
Pulley to the Top Frame (10) with a 3/8” x 3 3/4”
Bolt (70) and a 3/8” Nylon Locknut (84). Be sure
that the Cable is between the Pulley and the
hook, and that the end of the Cable with the
ball is on the indicated side of the hook.
16. Wrap the Long Cable (41) around a “V”-Pulley
(46). Attach the Pulley and a Long Cable Trap
(43) to the indicated bracket on the Front Upright
(4) with a 3/8” x 2 1/2” Bolt (79) and a 3/8” Nylon
Locknut (84). Be sure that the Long Cable Trap
is positioned to hold the Cable in place.
13. Attach the Speed Bag Hook (32) to the Speed
Bag Arm (7) with two #10 x 1” Bolts (88), two #10
x 2 1/2” Bolts (87), four #10 Washers (93), and
four #10 Nylon Locknuts (63).
14. The Punching Bag Arm (6) and the Speed Bag
Arm (7) can be adjusted to several heights. Hold
the Punching Bag Arm at the desired height, and
align the set of holes with a set of holes in the
Rear Upright (5). Have a second person repeat
this process with the Speed Bag Arm. Note:
Make sure the Punching Bag Arm (6) is on the
same side of the weight system as the hole in
the Stabilizer (not shown); refer to step 1. The
Punching Bag should hang so that the top is
slightly higher than the user’s head.
Attach the Punching Bag Arm (6) and the Speed
Bag Arm (7) to the Rear Upright (5) with two
Large Support Plates (8), two 3/8” x 6” Bolts (90),
two 3/8” Nylon Locknuts (84) and two Plastic
Covers (95).
13
14
8
84
95
5
7
8
90
41
Ball
Bracket
Hook
45
70
4
41
79
43
46
84
10
84
6
7
32
88
87
87
93
93
63
63
Cable Assembly