19
48. Wrap the Squat Cable (73) under a 3 1/2” Pulley
(78). Attach the Pulley to the indicated bracket on
the Long Base (120) with a 3/8” x 1 3/4” Bolt (93)
and a 3/8” Nylon Locknut (87).
49. Wrap the Squat Cable (73) over a 4 1/2” Pulley
(119). Attach the Pulley to the indicated bracket on
the Top Frame (6) with a 3/8” x 1 3/4” Bolt (93) and
a 3/8” Nylon Locknut (87).
50. Place a 1/2” Washer (1) on top of the Weight Tube
(43) closest to the Squat Upright (4).
Tighten a 1/2” Nut (118) halfway onto the end of the
Squat Cable (73). Screw the end of the Cable two
full turns into the Weight Tube (43). Then, tighten the
Nut against the 1/2” Washer (1).
51. Locate and open the parts bag labeled “SEAT
ASSEMBLY.”
Insert the Pad Tube (23) into the square hole in the
Seat Upright (9). Slide the two Knee Pads (19) onto
the Pad Tube as shown. Press the two Knee Pad
Caps (109) into the ends of the Pad Tube.
Slide two Short Pads (20) onto the Leg Lever (10).
51
48
49
50
119
73
10
20
20
23
19
19
9
109
109
87
78
93
120
SEAT ASSEMBLY
73
6
87
93
43
4
73
118
1