17
40. Wrap the VKR Low Cable (72) under a 3 1/2”
Pulley (78). Attach the Pulley to the indicated brack-
et on the Long Base (120) with a 3/8” x 1 3/4” Bolt
(93) and a 3/8” Nylon Locknut (87).
41. Route the VKR Low Cable (72) under the indicated
stack of Weights (44).
Wrap the VKR Low Cable (72) under a 3 1/2”
Pulley (78). Attach the Pulley to the indicated brack-
et on the Long Base (120) with a 3/8” x 1 3/4” Bolt
(93) and a 3/8” Nylon Locknut (87).
42. Wrap the VKR Low Cable (72) over a 3 1/2” Pulley
(78). Attach the Pulley and a Cable Trap (68)
between the indicated holes in the Pulley Plates
(63) with a 3/8” x 2” Bolt (100) and a 3/8” Nylon
Locknut (87).
Make sure that the Cable Trap is
turned to hold the Cable in the groove of the
Pulley.
43. Wrap the VKR Low Cable (72) under a 3 1/2”
Pulley (78). Attach the Pulley to the indicated brack-
et on the Short Base (2) with a 3/8” x 1 3/4” Bolt
(93) and a 3/8” Nylon Locknut (87).
43
40
41
42
93
78
120
72
87
93
120
72
78
87
44
72
68
100
63
2
72
93
87
78
78
87