Weider 8920 Home Gym User Manual


 
8
CABLE ASSEMBLY
11
8
9
10
58
58
55
16
21
Hook
Ball
15
50
58
7
47
58
21
7
21
6
50
23
6
42
8. During steps 9 through 22, refer to the CABLE
DIAGRAM on page 19 of this manual to verify
proper cable routing. Before beginning this sec-
tion, identify the Short Cable (23) and the Long
Cable (58) by comparing the ends of the cables.
IMPORTANT: While assembling the cables, do
not overtighten the bolts and nuts securing
the pulleys. The pulleys must turn freely.
9. Locate the Long Cable (58). Route the Long
Cable around a 90mm Pulley (15). Attach the
Pulley to the Top Frame (55) with an M10 x 90mm
Bolt (16) and an M10 Nylon Locknut (21). Be
sure that the end of the Cable with the ball is
on the indicated side of the Pulley and that
the Cable is between the Pulley and the hook
on the Top Frame.
10. Wrap the Long Cable (58) around a “V”-Pulley
(6). Attach the Pulley and a Long Cable Trap (50)
to the bracket on the Front Upright (42) with an
M10 x 60mm Bolt (7) and an M10 Nylon Locknut
(21). Be sure that the Cable Trap is positioned
to hold the Cable in the groove of the Pulley.
11. Route the Long Cable (58) around a “V”-Pulley
(6). Attach the Pulley and a Long Cable Trap (50)
to the Left Arm (47) with an M10 x 60mm Bolt (7)
and an M10 Nylon Locknut (21). Be sure that
the Cable is in the groove of the Pulley, and
that the Cable Trap is positioned to hold the
Cable in place.