Vision Fitness ST740 Home Gym User Manual


 
16
6
STEP
• With the loop end of the cable (F13) in
your hand, guide the cable through hole
in top of weight stack tower and around
pulleys A and B. Follow down weight
stack tower and through pulley C. Wrap it
around pulleys D and E on the pulley
bracket and secure loop end onto cam
(AF1) with two sleeves, one shoulder bolt
(M8x26), and one nylon nut (M8).
• Remove nut on bolt end of cable and
place the selector pin tether (K10) on bolt
shaft. Thread the nut on the bolt end of the
cable all the way to the head of the bolt.
Thread the bolt into the header plate,
making sure that there is a minimum of
0.5” of engagement. Secure by tightening
nut onto header plate.
YELLOW BAG
A
B
C
D
E
F13
F13
AF1
AF1
K10
K10