15
5
STEP
• Attach a bracket (Z40) to weight stack
tower with two flat washers (10.2x22x2)
and two bolts (M10x65). On the inside of
the tower attach two flat washers
(10.2x22x2) and two nylon nuts (M10).
See diagram for bracket orientation.
Partially tighten hardware.
• Take the swing arm axle and slide it
through the bracket on the support tube
(AG2). Slide the wavy washer (20.7x29.1x0.3)
onto axle and then the swing arm (AD1),
with arm pointing towards the tube. Next,
slide the spacer (20.7x26.5x4) on the axle,
followed by the range of motion cam (AF1).
Finish sliding the axle through the bracket
(Z40) attached to the weight stack tower.
Attach a bushing (F17), flat washer
(13x26x2.5), lock washer (12.2x21.5x3),
and a bolt (M12x25). Partially tighten
hardware. Finish by threading the pull pin
into the swing arm and engage in one of the
holes on the cam. Check to make sure the
swing arm axle is parallel to the floor before
tightening hardware. Tighten all hardware
before proceeding to Step 6.
NOTE:
Make sure the flats on the axle line
up with those on the mounting brackets.
BLACK BAG
F10
F10
AD1
AD1
AF1
AF1
AB1
AB1
Z40
Z40
AG2
AG2
F17
F17