13
3
STEP
• Stand the weight stack tower (AB1) so
that it is upright, and place it next to the
center floor support. Attach the tower to the
center floor support using two bolts
(M10x70), four flat washers (10.2x22x2),
and two nylon nuts (M10). Attach the
swing arm support (AG2) to the weight
stack tower using two bolts (M10x70), four
flat washers (10.2x22x2), and two nylon
nuts (M10). Use two bolts (M10x60), four
flat washers (10.2x22x2), and two nylon
nuts (M10) to secure the dual pulley brack-
et (AF2) to side of weight stack tower.
• Attach two pulleys to the weight stack
tower (AB1) with two bolts (M10x48),
four flat washers (M10x22x2), and two
nuts (M10). Tighten these two bolts.
PINK BAG
AB1AB1
AF2AF2
AG2AG2