ParaBody 883 Home Gym User Manual


 
25
STEP 15:
FIGURE 15
• Assemble two 3-1/2” PULLEYS (9) to the LEFT BOOM BRACKET (2) using two 3/8 X 1-3/4” BOLTS (13) and two 3/8”
LOW HEIGHT LOCK NUTS (14) as shown in FIGURE 15.
• Screw the long threaded end of the WEIGHT STACK CABLE into the end of the HEAD PLATE (6) .See FIGURE 15.
• Route the WEIGHT STACK CABLE around the pulleys in the LEFT BOOM BRACKET (2) as shown in FIGURE 15. (NOTE:
Make sure the cable runs in the grooves of the pulleys.)
• Assemble the WEIGHT STACK PIN (10) to the HEAD PLATE (6) as shown in FIGURE 15.
14
9
2
WEIGHT
STACK
CABLE
13 3/8 X 1-3/4”
10
6
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2