6
STEP 2:
FIGURE 2
• Remove the PEC STATION PAD from the FRAME, then discard the two 3/8 X 2-3/4” BOLTS. See FIGURE 2.
3/8 X 2-3/4”
STEP 3:
FIGURE 3
• SECURELY assemble the PULLEY BRACKET (15) and the PEC STATION PAD to the FRAME using two 3/8 X 3” BOLTS (18). See
FIGURE 3.
18 3/8 X 3”
15
3/8” WASHER
PEC STATION PAD
FRAME
PEC STATION PAD
FRAME
0
1
2
345
6
1/2 1/2 1/2 1/2 1/2 1/2