ParaBody 250101 Home Gym User Manual


 
15
FIGURE 15
STEP 15
• Securely assemble one 4-1/2” PULLEY (18) to the FLOATING PULLEY BRACKET (6) using one 3/8 X 1-3/4” BOLT (49) and
one 3/8” LOCK NUT (41) as shown in FIGURE 15.
• Securely assemble one 3-1/2” PULLEY (19) to the BASE (8) using one 3/8 X 1-3/4” BOLT (49), one “L” BRACKET (55), and
one 3/8” LOCK NUT (41) as shown in FIGURE 15. (Note: The “L” BRACKET should be positioned at a 45 degree angle to
function properly.)
• Route the “Loop” end of the LEG CURL CABLE (27) around the SWIVEL PULLEY BRACKET (5) and the previously in-
stalled pulleys and securely assemble it to the LEG CURL EXT (1) using one 3/8 X 1-1/4” BOLT (44), one 3/8” WASHER (38),
and one 3/8” LOCK NUT (41) as shown in FIGURE 15.
6
18
41
5
55
8
1
27
38
41
19
3/8 X 1-3/4” 49
3/8 X 1-1/4” 44
3/8 X 1-3/4” 49
41