Life Fitness GS4 Home Gym User Manual


 
STEP 16:
FIGURE 16
• Route the LAT CABLE (AM) through the PRESS ARM SUPPORT FRAME (X) and assemble one 3-1/2” PULLEY (35) to the
FRAME PRESS ARM SUPPORT FRAME (X) using one 3/8 X 8” BOLT (3), two 3/8” WASHERS (18), two 3/8 X 1-1/4” SPAC-
ERS (25) and one 3/8” LOCK NUT (19). See FIGURE 16.
• Route the LAT CABLE (AM) around one 3-1/2” PULLEY (35) and assemble the PULLEY to the DOUBLE FLOATING PULLEY
BRACKET (AA) using one 3/8 X 1-3/4” BOLT (11) and one 3/8” LOCK NUT (19). See FIGURE 16. (NOTE: Make sure the
cable runs in the grooves of the pulleys.)
17
• Route the LAT CABLE (AM) through the FRAME (A) and assemble one 3-1/2” PULLEY (35) to the FRAME (A) using one
3/8 X 3-3/4” BOLT (6), two 3/8 X 1-1/16” FLANGE SPACERS (26) and one 3/8” LOCK NUT (19). See FIGURE 16.