BEFORE
YOU BEGIN
ASSEMBLY
13
INTRODUCTION
IMPORTANT
PRECAUTIONS
ELLIPTICAL
OPERATION
CONDITIONING
GUIDELINES
TROUBLESHOOTING
& MAINTENANCE
LIMITED
WARRANTY
A S S E M B LY S T E P 6
GUIDE RAIL
TEFLON WASHERS (F)
LOWER HANDLEBAR
NUT (H) BOLT (E)
LOWER LINK ARM
SPACER (G)
LOWER LINK ARM
SPACER
TEFLON WASHERS
LOWER
HANDLEBAR
A) Open HARDWARE BAG FOR STEP 6.
B) Slide SPACER (G) into LOWER LINK ARM.
C) Place TEFLON WASHERS (F) on either side of SPACER (G). While holding TEFLON WASHERS (F) slide LOWER
LINK ARM into bottom end of LOWER HANDLEBAR.
D) Insert BOLT (E) into LOWER HANDLEBAR and secure using NUT (H).
C) Repeat on other side.
NYLON NUT (H)
INSIDE DIAMETER:
8 mm
Qty: 2
BOLT (E)
60 mm
Qty: 2
SPACER (G)
44 mm axis
Qty: 2
TEFLON WASHER (F)
28 mm
Qty: 4
HARDWARE BAG FOR STEP 6 CONTENTS :