BEFORE
YOU BEGIN
10
INTRODUCTION
IMPORTANT
PRECAUTIONS
ASSEMBLY
BEFORE
YOU BEGIN
ELLIPTICAL
OPERATION
LIMITED
WARRANTY
TROUBLESHOOTING
& MAINTENANCE
CONDITIONING
GUIDELINES
A S S E M B LY S T E P 3
A) Open HARDWARE BAG FOR STEP 3.
B) Attach REAR STABILIZER COVER using 2 BOLT (L).
C) Attach FRONT STABILIZER COVERS using 4 SCREWS (M).
BOLT (L)
20 mm
Qty: 2
SCREW (M)
10 mm
Qty: 4
HARDWARE BAG FOR STEP 3 CONTENTS :
REAR STABILIZER COVER
FRONT STABILIZER COVER
BOLTS (L)
SCREWS (M)