Evo Fitness 51551 Home Gym User Manual


 
Step 10:
ROUTING THE TOP CABLE:
Insert the bolt end of Top Cable (48)
through Pulley T1 (Ball End outside).
Route cable over Pulley T2, down and
around pulley T3, up and
around pulley T4, down
and attach to Select
Rod (32) at least
7 threads.
ASSEMBLY
assembly instructions
-17-
T1
T2
T4
T3
T5
T1
T2
T3
T4
T5
TOP CABLE (48)
ball end bolt end