20
43. Route the High Cable (88) up through the Left
Top Frame (4) and over a Small Pulley (84).
A
ttach the Pulley inside the Left Top Frame with
an M10 x 65mm Bolt (110), two M10 Washers
(109), two 1/2" Spacers (68), and an M10 Nylon
Locknut (111).
44. Route the High Cable (88) over a Small Pulley
(84) and down through the Left Top Frame (4).
Attach the Pulley inside the Left Top Frame with
an M10 x 65mm Bolt (110), two M10 Washers
(109), two 1/2" Spacers (68), and an M10 Nylon
Locknut (111).
45. Wrap the High Cable (88) under a Pulley (43).
Attach the Pulley, an M10 Washer (109), and two
Half Finger Guards (46) to the Military Press
Frame (20) with an M10 x 45mm Bolt (95) and an
M10 Nylon Locknut (111).
46. Wrap the High Cable (88) over a Pulley (43).
Attach the Pulley to the Left Top Frame (4) with
an M10 x 45mm Bolt (95) and an M10 Nylon
Locknut (111).
110
43
44
46
47
95
111
46
20
43
88
109
46
45
1
11
95
88
43
4
1
1
1
95
88
43
6
47. Wrap the High Cable (88) over a Pulley (43).
Attach the Pulley to the Center
Top Frame (6)
with an M10 x 45mm Bolt (95) and an M10 Nylon
Locknut (111).
68
84
109
109
111
6
8
88
4
110
68
84
109
109
111
68
88
4