Weider WESY39522 Home Gym User Manual


 
19
53. Wrap the Squat Cable (73) under a 3 1/2” Pulley
(78). Attach the Pulley and a Cable Trap (68) to the
second set of holes from the top in the indicated
bracket on the Long Base (120) with a 3/8” x 2” Bolt
(100) and a 3/8” Nylon Locknut (87). Make sure
that the Cable Trap is turned to hold the Cable
in the groove of the Pulley.
54. Wrap the Squat Cable (73) over a 4 1/2” Pulley
(119). Attach the Pulley to the indicated bracket on
the Top Frame (6) with a 3/8” x 1 3/4” Bolt (93) and
a 3/8” Nylon Locknut (87).
55. Place a 1/2” Washer (1) on top of the Weight Tube
(43) closest to the Squat Upright (4). Thread a 1/2”
Nut (118) halfway onto the end of the Squat Cable
(73).
Lift the Weight Tube (43) and the Top Weight (45)
and make sure that the small pin on the Weight
Tube is inside of the groove under the Top Weight.
Hold the Weight Tube (43) and the Top Weight (45)
a few inches over the weight stack and insert the
Weight Pin (50). Screw the end of the Squat Cable
(73) two full turns into the Weight Tube. Then, tighten
the 1/2” Nut (118) against the 1/2” Washer (1).
Remove the Weight Pin and set the Top Weight
back on the weight stack. Replace the Pin.
56. Locate and open the parts bag labeled “SEAT
ASSEMBLY.”
Insert the Pad Tube (23) into the square hole in the
Seat Upright (9). Slide the two Knee Pads (19) onto
the Pad Tube as shown. Press the two Knee Pad
Caps (109) into the ends of the Pad Tube.
Slide two Short Pads (20) onto the Leg Lever (10).
56
53
54
55
119
73
10
20
20
23
19
19
9
109
109
87
78
68
100
120
SEAT ASSEMBLY
73
6
87
93
43
4
73
118
1
45
50