7
5. Press the Weight Tube Bumper (64) into the end
of the Weight Tube (63). Insert the Weight Tube
into the stack of Weights (25). Be sure that the
pins on the Weight Tube are resting in the pin
grooves in the upper Weight.
Lubricate the insides of the holes in the Top
Weight (76). Set the Top Weight onto the stack of
Weights (25).
Insert both Weight Guides (62) into the stack of
Weights (25). Be sure that the holes in the
Weight Guides are at the top, as shown.
6. Attach the upper ends of the Weight Guides (62)
to the Top Frame (55) with the 5/16” x 6” Bolt
(60), two 1/2” x 3/4” Spacers (61), and a 5/16”
Nylon Locknut (3).
Be sure that the Pulley Bracket (20) is in front
of the right Weight Guide (62) as shown.
7
5
6
55
76
63
64
25
62
Lubricate
Pin Groove
60
20
62
3
Tube
Welded
Spacers
17
Lubricate
15
21
4
75
59
61
Holes
Arm Assembly
7. Press a 1” x 7/8” Plastic Bushing (75) onto each
welded spacer on the Press Frame (17). Slide the
Press Frame into place on the Base (4). Note:
This will be a tight fit. The Plastic Bushings
should fit onto each end of the indicated tube
in the Base. Be sure that the 3 1/2” Pulley (15)
is on the indicated side.
Lubricate the 3/8” x 8” Bolt (59). Attach the Press
Frame (17) to the Base (4) with the Bolt and a
3/8” Nylon Locknut (21). Do not overtighten the
Locknut; the Press Frame must be able to
pivot freely.