Weider WESY19510 Home Gym User Manual


 
10
15. Route the Long Cable (23) around the “V”-Pulley
(6) on the Right Arm (48). Be sure that the
Cable is in the groove of the “V”-Pulley and
that the Long Cable Trap (50) is turned to hold
the Cable in place. Tighten the 3/8” x 2 1/2” Bolt
(7) and the 3/8” Nylon Locknut (not shown).
16. Route the Long Cable (23) around the 3 1/2”
Pulley (15) attached to the Pulley Bracket (20).
Be sure that the Cable is in the groove of the
Pulley and that the Cable Trap (66) is turned
to hold the Cable in place. Tighten the 3/8” x 2”
Bolt (12) and the 3/8” Nylon Locknut (not shown).
Be sure that the 5/16” x 5” Bolt (68) is properly
tightened and that the Pulley Bracket (20) can
move freely.
17. See the inset drawing. Attach a 3 1/2” Pulley (15)
and a Cable Trap (66) to the indicated hole in the
Long “U”-Bracket (57) with a 3/8” x 2” Bolt (12)
and a 3/8” Nylon Locknut (21). Be sure that the
Cable Trap is inside the “U”-Bracket. Note:
This may come pre-assembled.
Route the Long Cable (23) between the 3 1/2”
Pulley (15) and the Cable Trap (66). Be sure that
the Cable is in the groove of the Pulley and
that the Cable and Pulley move smoothly.
18. Note: The 3 1/2”Pulley (15) in this drawing is
pre-assembled. It is shown disassembled for
easy part identification.
Route the Long Cable (23) around the 3 1/2”
Pulley (15) attached to the bracket on the Top
Frame (55). Tighten the 3/8” x 2” Bolt (12) and
the 3/8” Nylon Locknut (21). Be sure that the
Cable is in the groove of the Pulley and that
the Cable and Pulley move smoothly.
18
15
16
17
48
50
7
6
23
66
15
12
20
68
23
21
12
15
23
57
66
12
15
23
Bracket
55
21
23