37
ABS-PRC001-EN
Job Site
Connections
Hot Water
Piping
Table JC-2. Hot water supply piping responsibilities
Material Provided By Installed By
Item Trane Other Trane Other
Energy Valve (2-Way/3-Way) X X
Gate valve, balance valve, Y-type strainer w/valve,
bypass circuit, check valve, thermometer, pressure gauge, X X
vent shutoff valve, union or flanged connection circulating pump
Rupture Disk Assembly X X
Rupture Disk Piping X X
Figure JC-4. Hot water supply temperature piping above 270°F