ParaBody 625 Home Gym User Manual


 
1.
Push the two (2) pec return cables over the
dowel on each of lhe pec returns.
2.
Slip the two (2) 1" dia. white end caps over
the 1" shafts on the pec returns.
3.
Locate and stick the hvo (2) carriage guides
approx, as shown.
NOTE:
They should prevent the pec return from
striking the inside of the per bearing
housing.
4.
Slip the elastic cord ave; the 1" din. white end
caps as shown. Make sure to hook the elastic
cord over the formed hook inside the pec
bearing housing.
5.
Attach the two (2) pec return cables to the kirk
start cable using one (1) 3/8" x 3/4" bolt and
one (1) 3/~-lock nut and tighten.
CORD 31,,~" I.D.
PEC RETURN CABLE - 2 ~
(PE,3276-01
{P~3278-01)
1.
Route the pet/D-ring cable as shown and load
into the D-ring. Add the 4|/2" w/l" clevis
pulley to the main frame using existing
hardware already installed. (see Lat Station-
figure 32.)
Tighten all loose connections at this point.
Set the elastic shack cord 72" Ig. aside until
instruded to install in the rotary assembly
instructions. (see Rotary Station
Figures 49-51.)
If the Rotary Station is already installed, attach
the elastic shock cord to the D-Ring end of the
Pec Cable, loop over the middle 2" pulley and
attach to the peg at the base alongside the
Multi-Press and Rotary shock cords. Make sure
shock cords are not touching one another.
PEC CABLE
IPB3277-0 i
LAT ~ABL~
(PB3233-01
4~/2" W/1
~.
CLEVIS
PULLEY
Your unit should be assembled as shown at this
point.
Proceed to the assembly instructions for the
Rotary Station.