\\
ii
III
318 X 2-114" /
(CONTINUED FROM PREVIOUS PAGE.)
~ake a loop with the AB CABLE (t11) and LOOSELY assemble two 5-1/4 IN, PLATES (26) and
‘5-1/2 X 1 IN. PULLEYS (100) to the AB CABLE (111) using two 5/8 X 2-1/4 IN. BOLTS (71),
‘5/B IN. WASHERS (69), and two .5/8 IN. LOCK NUTS (91).
’~Securely assemble fhe ball end of 1.he AB CABLE (111) and one ,5-1/2 X 1 IN. PULLEY (100) fo
FRONT UPRIGHT (22) using two 3/8 x 2-3/4 IN. BOLTS (75,), fwo 3/8 IN. FLANGE SPACERS (97),
two 5/8 IN. WASHERS (69), and fwo 5/8 IN. LOCK NUTS (91). (Note: The AB CABLE should be
toured undernea1.h fhe refaining bolt as shown.)
one SNAP LINK (53) to l-he ball end of the AB CABLE (111).
C. AHach the AB STRAP (106) to the SNAP LINK (55) on the end of the AB CABLE as shown on drawing.
28