LAT
CA]~LE
NOTD MAKE SURE CABLE RUNS OVER
OVER THE TOP OF THE BOLTS,
(CONTINUED FROM PREVIOUS PAGE)
*Run the LAT CABLE (112) through fhe BASE PULLEY (~s shown in druwing detoil.
*Run the LAT CABLE (112) through fhe hole of the D-RING (28) c~s shown,
at|~ch one KEYHOLE CLEVIS (61) to the end of the LAT CABLE (112).
*Replace and SECURELY -lighten fhe two PULLEY and two BOLT connecfions
from the previous sfeps. (IMPORTANT: MAKE SURE THE LAT CABLE RUNS
OVER THE TOP OF THE BOLTS IN THE TOP BOOM
Id .
6
I