Impex IGS 16 Home Gym User Manual


 
STEP 13 Upper Cable Looping (See Diagram 13)
A.) Slide a Ball Stopper (#70) onto the 161” Upper Cable (#52). Slide and Pull the Cable Strap
Bracket (#45) onto the Cable. Secure the Bracket with a M8 x 1 ¼” Allen Bolt (#110) and M8
Aircraft Nut (#124).
B.) Attach the tip of the Upper Cable to the Pulley on the front of the Upper Frame (#5). Insert
the Cable into the Frame through the tube to the second opening. Remove the Pulley to get
the Cable out then reinstall the Pulley.
C.) Draw the Cable around the Pulley then down to the right Pulley on the back of the Bench
Press Base (#32). Draw the Cable around the right Pulley then to the Pulley on the front of
the Front Vertical Beam (#3).
D.) Draw the Cable around the Pulley then back to the left Pulley on the back of the Bench Press
Base (#32).
E.) Draw the Cable around the left Pulley then to the Pulley in the upper open slot on the Front
Vertical Beam (#3).
F.) Draw the Cable underneath the Pulley then pull upward to the first right Pulley underneath
the Upper Frame. Draw the Cable over the Pulley to the second right Pulley underneath the
Upper Frame.
G.) Draw the Cable over the Pulley then pull downward. Attach the Cable to the upper Pulley on
an Angled Double Floating Pulley Bracket (#26) installed in Step12. Attach the Bracket
underneath the Pulley Pre-tensioner (#24).
H.) Draw the Cable underneath the Pulley then pull upward to the Pulley on the Adjustable
Single Pulley Bracket installed in Step-7G. Let the Double Floating Pulley Bracket (#26)
hanging for now.
I.) Draw the Cable around the Pulley then pull downward to the Selector Rod (#36).
J.) Attach the end of the Cable to a M12 x 1” Split Bolt (#42). Thread the Split Bolt through a Ø
1” Spring Washer (#116) and the ring on the Weight Plate Selector Pin (#72) into the
Selector Rod (#36).
K.) Connect the Lat Bar (#17) to the Cable Strap Bracket with a Hook (#41).
L.) Place the Lat Bar onto the Lat Bar Holder.
19